Snowy Soo

Winter Railroading.
Showing posts with label switching. Show all posts
Showing posts with label switching. Show all posts

Friday, 17 April 2015

Great video: Area H spur being worked

Here's a great YouTube video showing the top end of Area H spur being worked by CP crew:


 

The YouTuber here is CitySlicker.

He shoots a lot of great Toronto-area railroad videos. He also has a very good flickr site.

Chances are if there's a strong photo at the top of my blog showing Area H or Canpa switching, it's a photo link to his flickr!

I realize there's been more prototype material than model material here lately.

I've haven't been able to get to the layout. Progress there has very much been slow motion I'm afraid.

I've not given up on the project however. I'm hoping to post part II of the Hymopak structure build soon.

In the meantime, enjoy this video.

As always, I welcome your comments.


Monday, 28 July 2014

Great "finished" switching layout



Modeller James McNabb has built an excellent modern-day HO-scale  layout with his Grimes Line, which you can check out here or in videos posted on his YouTube channel. The layout models a section of the Iowa Interstate Railway.

James's layout features simple, great scenery and a track plan that adheres to the prototype and resists the temptation to fill every square inch of layout surface area with track. I love his photo backdrops and how the layout is presented with the clean fascia, nice overhead lighting, etc.

Perhaps most impressive is that his layout is now "finished," a stage few layouts ever reach (though in a recent post on Model Railway Hobbyist blog he admits there are likely other details to add). Still the layout is at enough of a developed stage that he feels comfortable calling it complete, which is an achievement for any modeller.

A great source of inspiration, be sure to check out his online material which is always presented as well as the layout itself.