Monday, 1 July 2013

Blue sky ahead! Backdrop installed


Goodbye tool rack; hello blue backdrop. 

Layout progress is inching along. Summer is here and I've always considered model railroading more of a winter pursuit. Still, I managed to get the backdrop installed last week, so no more brick wall/tool rack backdrop.

I was worried the colour was too light but the paint store guy convinced me it would be blue enough, and I'm glad he did. In these photos it looks almost too white, but in real life, it more closely resembles sky.

Here's two more pics.

Here's one looking in the other direction.


Here's one looking toward south west corner of the layout. Throttle pockets would be a good idea about now!
I realize that I could have curved the hardboard here for a more eye-pleasing corner, put I found it would have made it too hard to put a building there. 


Next will be to finish getting the track down and wired. I'm pondering widening the peninsula (not pictured) to make way for a larger industry.  Future plans also include uploading a short video to show the trains running. Happy with the way everything is operating during the test runs so far. Really enjoying DCC.

After that, the plan is to add the staging yard behind the workbench and fascia. 

Until next time...




Saturday, 8 June 2013

June layout update


This is the Lambton Yard area, where the railroad has expropriated a former leg of my workbench. I'm going to have to do something with that tool rack. It will give me a lot more yard space though. 


It’s been a long time since the last layout update but despite this, I’ve managed to do a fair bit of work. Here’s a quick breakdown.

Layout extension


Hungry for more layout space, I’ve added about six feet to the layout by placing it on top what was one leg of my L-shaped workbench. I decided I’d be using the layout more than the workbench, plus I’ve got sawhorses a Black and Decker Workmate and other options if I need more workspace for projects. In order to make way for the extension, I placed some 2x4s on the former workbench, turned them on their ends and screwed them to the plywood. Then I laid the foam over the 2x4 sleepers, glued that down and voila, instant layout extension. The problem now is that the peg board holding the tools will likely have to be moved to make way for a backdrop and to prevent hammers, chisels, adjustable wrenches, etc. from raining down on my locos and rolling stock.

Wiring


I followed NCE’s wiring recommendations: a 14-gauge buss under the layout and 18-gauge feeders to each (almost) each piece of track. At first I used those suitcase connectors to attach the feeders to the buss, but I found them too finicky to use. I’m pretty adept at soldering, so I just stripped ½ of insulation off the buss, then about ¾ of insulation off the feeder. Then I wrapped the feeder around the bare spot on the buss a few times, soldered it and covered the connection with electrical tape. It’s hard to get a better electrical connection than that. Over the yard, where I needed lots of feeders in one area of the layout, I brought a feeder line from the buss to a terminal block, then made little loops connecting the points so all screws on the block were powered by the same circuit. Then if I needed to connect a feeder in the area, I just ran it back to that terminal block. Cuts down on the soldering a bit.

Many suggest running feeder to every piece of track. The thinking is that this way you’re not relying on rail joiners to carry power from one section of rail to the other. I laid a bunch of track a long way from the nearest feeder and ran trains, just to see if it would work (the nearest feeder was four feet and many rail sections away) it ran no problem, I couldn’t make any of my locos stall even at slow speeds. But I still followed best practices and added feeders to most (though not every) piece of rail. The layout runs great, I’ve yet to have a stall. Also I performed the “quarter test” on every track and the NCE PowerCab short circuit detector shut down the layout each time, as it’s supposed to do. When wiring, I always test as I go, running trains over the spot after making every connection to ensure I’ve not wired a short, which would become tough to pinpoint later on.

At first I had trouble, and was melting ties when attaching the feeders to the rails but that improved when I switched to a 40-watt soldering iron with very thin solder. I also place a piece of metal over the rails to act as a heat sink, which helps keep the ties in a solid state.

This is the subway that goes under the tracks at Runnymede Road.

Here's the prototype shot of the Runnymede Road subway. I still have plenty of work to do!.


Track laying


I have great admiration for those who handlay their track, and it’s something I may attempt one day. For now, I just want to get trains running quickly so I’m using Atlas and Peco Code 100 track and turnouts, which are widely available. I laid the track right on the lines sharpied onto the foam. I found a few dabs of glue under the flextrack gives enough adhesion while leaving open the possibility of pulling up and reusing the track down the line. I’ve laid much of the track in the Lambton yard area and the spurs around it. I’ve also started the extension that leads to the staging yard. I’ve not yet laid the track around the peninsula (on the south end of the layout).

There are those who would take more time with all of these steps while using more prototypical track, but I have very limited available modeling time and I wanted to get trains running right away.

I’m enjoying picking up and setting off cars on my small layout … even though the track is running over pink foam and there’s no backdrop or buildings.

Looking from Lamton Yard over toward the West wall of the basement.

Close up of some of my motive power, anxious to get to work!


So what’s next:


  1. Finish track laying. I’ve still got to do the spurs that lead to Korex.
  2. Adding the backdrop. This will involve removing the tool rack. Not looking forward to that. I’m thinking of using hardboard painted a light sky blue at a height of 24 inches.
  3.  Fascia. I love the finished look the fascia gives the layout and so I’m going to add a hardboard fascia soon.

Tuesday, 16 October 2012

Getting started: The benchwork


Getting started: The benchwork       


I decided to build my layout on open-grid benchwork with extruded insulation foam on top. I love how larger layouts use L-girder benchwork to run tracks at various heights with scenery and other tracks above and below, but I don’t really need (or want) to do that with this layout. Most  areas are more or less flat so I don’t need those elevation changes (don’t have room for them anyway). The foam is easy to attach track to and run wires through and you can carve and sand bumps and shallow waterways into it where you need to create some definition to the land.

I made the frames using extra wood I had lying  around and left over from other projects. These include 2x3s and pieces of ¾ plywood ripped into 3” sections. Before installing the frames, I drilled wiring holes in down the centre of the cross-pieces to run the wiring buss. As you can see, the side under the window is built with plywood, the one closest to the camera is made with 2x3s. I’m sure a purist would cringe at mixing up the wood like this but that’s what I had on hand (the wife was on me to get rid of it, not sure if this is what she had in mind but oh well). Besides, the wood becomes invisible eventually anyway. As long as it’s study, it doesn’t matter much what you use.

Benchwork beginnings. Yes, the lighting sucks. You can see the layout will take on a U shape.

Here's the benchwork on the south wall. Used plywood here because that's what I had. Small layouts are a great way to use up old lumber!


Next I added the foam top, using the correct calk for foam. I’ve heard that some caulks and glues will attack the foam, so you can’t just use any old adhesive for this step. You can see the layout at this stage below.

Here it is with the foam added. Ready for track...



In the next entry I will, with some reluctance, get into the topic of DCC and reveal what DCC system I chose for this layout! A track plan will also be posted, just as soon as I draw one in a digital friendly format. You can see how much trouble I'm having with this Blogger template!